Project:
BobCollins
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (575)
Empennage
- (67)
-
Polished the stabilator
-
Trimmed stabilator skin
-
Stabilator - Fairing...
-
Drilling emp fairing...
-
Finished fairing...
-
Prepped emp fairing...
-
Drilled empennage...
-
Finished cutting emp...
-
Cut out the top emp...
-
More marking up the...
-
Finished VS and...
-
Polished VS and rudder
-
Started on VS and...
-
Taking everything...
-
More stabilator...
-
Stabilator attached!!!
-
How to waste another...
-
How to waste an...
-
Attached rudder
-
Completed the...
-
Assembled push rod...
-
Fit control surfaces...
-
Fit the vertical...
-
Completed tailcone
-
Began riveting top skin
-
Fit the top tailcone...
-
Completed side skin...
-
Completed right side...
-
More riveting of...
-
Riveted side skins
-
Prepped top corner...
-
Installed some...
-
Completed riveting...
-
More riveting of...
-
Riveted bottom skin...
-
Fit side skirts to...
-
Started work on...
-
Fit aft bulkhead to...
-
Finished riveting...
-
Riveted aft bulkhead
-
Made tie-down bracket
-
Assembled bulkheads
-
Stabilator completed
-
Completed skinning...
-
Began riveting left...
-
Completed right...
-
More riveting
-
Reamed holes
-
Fit skin on stabilator
-
Completed stabilator...
-
Riveted control...
-
Riveting platenuts
-
Spar box assembly
-
Stabilator spar box...
-
Stabilator parts prep
-
Completed right anti...
-
Started on right...
-
Completed left trim...
-
Completed rudder
-
Primed anad riveted...
-
Began work on rudder
-
Completed vertical...
-
Completed VS...
-
Riveted upper spar...
-
Completed other half...
-
First parts for...
-
Kit inventory
Wings
- (54)
-
Replaced right wing...
-
Let's wait some more!
-
More AOA work
-
More odds and ends
-
AOA Retrofit
-
Attached wings
-
Finished work on...
-
Completed right...
-
Flaperon skin riveting
-
Riveted ribs etc to...
-
Prep work on the...
-
Started work on...
-
Riveted skin to...
-
Riveted ribs on...
-
Flaperon work
-
Started on left...
-
Completed right wing
-
Right wing closeout
-
Riveted wing root...
-
Started on wing...
-
Fit the top middle skin
-
Riveted bottom...
-
Completed inboard...
-
Completed inboard...
-
Began skinning right...
-
Finished the left wing
-
Fluted and riveted...
-
Worked on wing tips
-
Drilled out some rivets
-
Completed top of...
-
Started on top skins...
-
Completed bottom...
-
Bottom left center skin
-
Riveted inboard and...
-
Began riveting wing...
-
Wiring runs
-
Installed stall...
-
Completed rib...
-
Began installation...
-
Wing rib riveting
-
Began mounting the ribs
-
Completed nose ribs;...
-
Started working on...
-
Finished W-1208L rib...
-
Started prep work on...
-
Completed rear spar
-
Countersinking and...
-
Rivet hinge bracket...
-
Riveted brackets
-
Primed spar stub...
-
Began rear spar...
-
Riveted wing doublers
-
Started work on wings
-
Wing kit arrives
Fuselage
- (124)
-
Fitting tail cone to...
-
Prepping parts for...
-
Assembling various...
-
Repainted rollbar....
-
Completed fuselage...
-
Riveted angle...
-
Added sealant to...
-
Riveted handle to...
-
Sealed side canopy...
-
Finished riveting...
-
Riveted canopy ribs on
-
Rivet engine mount...
-
Completed canopy ribs
-
Adding remaining...
-
Began working on...
-
Installed upper...
-
Riveted hinge on...
-
Began work on upper...
-
Section 29: Forward...
-
Completed brake lines
-
Started making brake...
-
Drilled brake pedals
-
Expensive brake...
-
Brake pedal drilling
-
Testing of the fuel...
-
Finished sealing...
-
Sealed fuel gauge
-
Section 28: Rudder...
-
Riveted bottom skin...
-
More fuel tank sealing
-
Started sealing the...
-
Nutplates and fuel...
-
Section 26: Started...
-
Completed second...
-
Started working on...
-
Finished a seatback
-
Seatback riveting
-
Started on seatbacks
-
Completed Section 24
-
Roll bar support
-
Rear bulkhead
-
Painted parts of...
-
Removed rollbar
-
Riveted support bracket
-
Side rollbar support
-
Prepping rollbar for...
-
Deburred rollbar
-
Removed rollbar
-
Finished drilling...
-
Started drilling...
-
Fit rollbar
-
Section 24: Rollbar...
-
Completed Section 23
-
Assembled fuselage...
-
Riveted left side skin
-
Added nutplates to...
-
Drilling right longeron
-
Completed right side...
-
Began riveting side...
-
Finished nutplates...
-
Deburred right side...
-
Drilled longeron holes
-
Finished wing...
-
Longerons
-
Riveted forward post
-
Countersunk longeron
-
Attached one...
-
Countersunk wrong...
-
Riveted on seatbat...
-
Primed longerons
-
Drilled top plates...
-
Twisting the...
-
Completed mating of...
-
Completed forward...
-
Bottom skin to firewall
-
Completed firewall...
-
Riveted bottom skin...
-
Firewall work
-
Section 22: Firewall...
-
Completed Section 21
-
The case of the...
-
Prepped aft brackets
-
Riveted forward floors
-
Prepped remaining...
-
Completed riveting...
-
Riveting bottom skin
-
Riveted...
-
Fit bottom skin
-
Prepped bottom skin
-
Prepped up angles
-
Riveted shark gills
-
Began work on 'shark...
-
Riveted forward...
-
More work on forward...
-
More riveting on aft...
-
Fuselage rear bulkhead
-
Added center section...
-
Riveted right side...
-
Riveted left side...
-
Started fitting floors
-
Riveted brackets
-
More rib prep
-
More seat rib work
-
Started on seat ribs
-
Pulley assembly and...
-
Stuck with Cherry...
-
Finished attaching...
-
Finished riveting...
-
Finished riveting...
-
Attached left ribs...
-
Finished right side...
-
Started riveting...
-
Attached nutplates...
-
Various puttering...
-
Riveted floors to...
-
Riveted ELT bracket...
-
ELT bracket
-
More center section...
-
Adding more parts to...
-
Finished drilling...
-
50 down. 74 to go
-
Fit center section...
-
Started on center...
-
Fuselage kit arrives
Finishing
- (69)
-
Sealed rear window
-
Reinstalled window
-
Finished final...
-
Window drilled
-
Now back to the window
-
Attached throttle...
-
Drilling of rear...
-
Fitting of rear window
-
Installed gear leg...
-
More gear leg...
-
Gear leg cover prep...
-
Attached flaperon...
-
Catastrophe averted
-
Riveted top skins
-
Routed new fuel...
-
Connected ADHRS
-
Tail cone goes on
-
Cotter pins in wheel...
-
Starting over on...
-
Cut notches in rear...
-
More rear window...
-
Fit rear window
-
Doing stuff I...
-
Attached oil door to...
-
Finished inlets and...
-
Sanded NACA and airbox
-
Bonded air box and...
-
Prepped filtered air...
-
Bonded NACA vent to...
-
Filled gaps between...
-
Epoxied cooling...
-
Cut out the cooling...
-
Cowling closeout
-
Completed riveting...
-
Start riveting...
-
Fiberglassing work...
-
Drilled the side...
-
Prepared to drill...
-
Drilled side hinges...
-
Drilled aft edges to...
-
Preparing to drill...
-
Trimmed aft sides of...
-
Drilled top cowl and...
-
More trimming and...
-
Spacers for spinner...
-
Finished cowling...
-
Canopy trimming
-
Brake fluid added
-
Brake lines
-
Finished main wheel...
-
Main wheel and tire...
-
Tired
-
Attached engine mount
-
Flap motor
-
Attached flap...
-
Riveted control arms...
-
Drilled rod end...
-
Bolted control rods...
-
Tapped control rods
-
Begin yoke installation
-
Crontrol yoke...
-
Installed pulleys
-
Cable routing
-
Added clamps to...
-
Started working on...
-
Installed control...
-
Prepped control rod...
-
Finishing kit arrived
Canopy
- (28)
-
Set up for canopy...
-
Sanding foam block
-
Bonded foam block
-
Cut foam blocks
-
Prepped for canopy...
-
Canopy guide blocks...
-
Removed struts
-
Started on SB0000-88
-
Riveted front of canopy
-
Ran out of screws
-
Resumed work on canopy
-
Added canopy blocks
-
Canopy latch odds...
-
Guide block nonsense
-
Painted skirts
-
Canopy work
-
Drilled canopy skirts
-
Drilled front and...
-
Drilled front frame
-
Fit canopy
-
Painted canopy frame
-
Canopy prep
-
Riveted side arms on...
-
Fluted canopy frame...
-
Mounted canopy frame
-
Gas struts to canopy...
-
Started on canopy frame
Fuel System
- (12)
-
Reinstalled fuel...
-
Constructed new fuel...
-
Added missing...
-
Remade tank to vent...
-
Fuel prefilter to...
-
Fuel pump assembly
-
Assembled fuel...
-
Ran fuel lines to...
-
Installed fuel valve
-
Remade some fuel lines
-
Started making fuel...
-
Section 27: Fit the...
Firewall
- (3)
-
Heater cable...
-
Heater vent assembly...
-
Vent hinges
Controls
- (13)
-
Set ECO stop
-
Attached throttle...
-
Problem attaching...
-
Prepped flap motor...
-
Primed, painted...
-
Routing throttle and...
-
Throttle system work
-
Started on throttle...
-
Final holes drilled...
-
Time to remove wings
-
Drilled flaperon...
-
Prepped flaperon...
-
Attached flaperons...
Landing Gear
- (30)
-
Set breakout force...
-
Final touches on...
-
Finished (somewhat)...
-
Drilled hinge to...
-
Drilled gear leg...
-
Started on nose gear...
-
Finished nose wheel...
-
Riveted nose wheel...
-
Rivted side brackets...
-
Oshkosh or no?
-
Finished right...
-
Fit right wheelpant
-
Fit right wheelpant
-
Started right wheelpant
-
Completed left...
-
Fixed left wheelpant...
-
Identified left...
-
Installed left...
-
Left axle work for...
-
Landing gear cutout
-
Sand forward half...
-
Adjust left...
-
Trimmed wheelpant...
-
Started on wheelpants
-
Nose gear fork to...
-
Bolted nose gear fork
-
Main gear installed
-
Left side axle
-
Finished left side...
-
Landing gear work
Lighting
- (13)
-
Riveted cockpit...
-
Miscellaneous puttering
-
Completed right wing...
-
Completed AOA...
-
Fixed some wire...
-
Finished right wing...
-
Completed left light...
-
Started on right...
-
Epoxied the lighting...
-
Cut access hole in...
-
Finished landing...
-
Began installing...
Avionics
- (80)
-
Finished GPU...
-
Made a bracket for GPU
-
Wired up White...
-
Mucking around the...
-
Avionics are alive
-
Ground power unit
-
Closed up the panel
-
Sealed wire...
-
Nutplate for fuel...
-
Prepped panel for MFD
-
Removing AMP connectors
-
Cleaning up things...
-
Discovering errors
-
Fitting panels
-
Sealing grommets
-
Installed platenuts...
-
Tidying up some wiring
-
My kingdom for a screw!
-
Installed...
-
Putting stuff back...
-
Installed GEA 24
-
Installed GTR 200...
-
One step back
-
Building supports...
-
ProSealed rivet heads
-
Finished firewall...
-
Firewall drilling
-
Prepped more G3X pieces
-
Prepped G3X brackets
-
Added instrument...
-
Moved autopilot...
-
Installed autopilot...
-
Installed autopilot...
-
Autopilot pushrods
-
Prepped top baggage...
-
Added chafing...
-
Installed ADS-B IN...
-
Reinstalled fuel...
-
It's time to put...
-
Not much of anything
-
Installing equipment...
-
Finished installing...
-
Installing bushings
-
Crimped on...
-
Connected ELT, ran...
-
ELT, Fuel pumps,...
-
Snap bushings and...
-
Two steps forward....
-
Flap motor wiring
-
Installed headphone...
-
Connections to stick...
-
Finished routing...
-
Routed wires on the...
-
GPS/XM wires routed
-
Secured fuse block...
-
Attached Generator A...
-
Connected relay wires
-
Connected G3x wires...
-
Rerouting wires
-
These instructions...
-
Connected coax to...
-
Installed autopilot...
-
Connected trim wires...
-
Routed fuel pump wires
-
Finished pilot-side...
-
Mounted AV-6000
-
Began plotting the...
-
Completed stick wiring
-
Back to work on the...
-
Expanded forward...
-
Evaluated holes that...
-
Enlarged holes
-
The curse of the...
-
Installed ELT.
-
Canopy lock sensor
-
Installed stick grips
-
Drilled hole in stick
-
Com and transponder...
-
CPU fans installed
-
Ordered avionics
Engine
- (35)
-
Finished trimming...
-
Fitting bottom cowling
-
Secured throttle cable
-
Completed heating...
-
Overflow bottle and...
-
Installed oil lines...
-
Attached oil tank
-
Radiator hoses attached
-
Installed oil cooler...
-
Reinstalled muffler
-
Stalled on the...
-
Muffler/exaust...
-
Assembled...
-
Finished pitot tube...
-
Started the cowling
-
Completed Section...
-
Clamped ECU wires
-
Mounted ECU
-
Fuse box work
-
Heat shield and fuse...
-
Cut firesleeve
-
Retorqued engine bolts
-
Hung the engine
-
Drilled second...
-
Solved CPS-1 and 2...
-
Engine mount bolted...
-
Engine mount to engine
-
Removed coolant hoses
-
Completed Section 27
-
Reference pictures...
-
Uncrated the ROTAX...
-
Started putting...
-
Started work on fuel...
-
Powerplant kit arrives
-
Engine shipped
Propeller
- (14)
-
Completed Section 47
-
Set propeller pitch
-
Reinstalled prop
-
Drilled for...
-
Drilled more holes...
-
Fabricated spinner...
-
Drilled spinner to...
-
Drilled spinner to...
-
Aligned spinner
-
ProSealed the pitot...
-
Made spinner cuts...
-
Installed pitot...
-
Started pitot tube...
-
Fitting the top cowling
Interior Finish
- (2)
-
Prepped canopy frame...
-
Primer and etching
Paint / Decals
Inspection
Research
Workshop
- (2)
-
Resurfaced hangar ramp
-
Retired
Service B's
- (29)
-
Completed SB-00088
-
Completed service...
-
Prepped spacers etc
-
Started on...
-
SL-00070
-
Complied with SB 00059
-
Complied with...
-
Complied with...
-
SB fix kits arrive
-
Completed SB-00058
-
Started on SB-00058
-
Preparing to undo...
-
Reinstalled fuel...
-
Began routing wires aft
-
Completed SB-53
-
Started on SB-53
-
Getting ready to...
-
Complied with SB-00013
-
Complied with SB-00023
-
Fully finished SD-00001
-
Mostly finished...
-
Began SD-00001 fix
-
SB 19--08-26...
-
Reinstalled flaperon...
-
Stabilator service...
-
Stabilator service...
-
Stabilator service...
-
Started on service...
-
Service Bulletin...
Builder Name:
Bob Collins
-
Project:
Vans - RV-12iS
-
VIEW REPORTS
Total Hours:
1055
Total Expense:
$101645.34
Start/Last Date:
Jan 04, 2017 - No Finish Date
Engine:
Rotax 912iS
Propeller:
Sensenich
Panel:
Dual screen G3X, autopilot
Friendly URL:
https://eaabuilderslog.org?s=BobCollins
Home or Last Project Picture
Jun 05, 2017
Wing kit arrives
- (2 hours)
Category: Wings
Sean Collins and John Wanamaker helped me unload. Let the inventorying begin.
IMAG0050.jpg
IMAG0051.jpg